Headquarters for a construction company

  • Year: 2023
  • Surface: 420m²
  • Localization: Itatiba SP
  • Structure design: StudioBim
  • Facilities design: StudioBim
  • Lightning design : Denis Joelsons
  • Acoustics consultant: Helena Padovani
The construction company's headquarters in Itatiba-SP was designed to mark a new phase for the company, marked by the growth of the team and new perspectives in the market.
In addition to functioning as an efficient workspace, the headquarters were intended to be a striking expression of the brand's identity when welcoming customers and partners.

The strategic location of the site, positioned on a corner with access at different levels, played a crucial role in organizing the architectural program. By being located at an intermediate level, it made it possible to create a shelter for cars at the lowest street level, while pedestrian access was designed for the highest street.

The architectural design of the building is a direct response to the mandatory setbacks of the land, which shape its volume. Inside, the construction is articulated around a central void, establishing visual connections between different levels, programs and users. This arrangement not only creates an interesting dynamic within the space, but also facilitates a generous influx of natural light, promoting a vibrant and stimulating internal environment.

Regarding execution, the project opted for a mixed structure of concrete and steel. Concrete, due to its amorphous nature, flexibly adapts to the geometric demands of the ground floor, while steel, with its characteristic lightness and slenderness, makes up the upper floor structure.

The organization of the programs, as mentioned, combined with the structure and enclosure materials, presented a challenge for the project: ensuring maximum acoustic comfort for users. To achieve this objective, sound absorption plans were developed. Over the work tables, there is a cloud of lighting and absorption, made up of PET wool sheets alternating with direct and indirect luminaires. Covering the entire support program block and camouflaging its doors, there is an extensive wooden slatted panel. Its dimensions and the spacing between the pieces are calculated to provide enough space for the sound to be absorbed by the layer of PET wool applied behind the slats. To finish and guarantee absorption in the double-height space, the entire ceiling of the upper floor was designed with a modular ceiling system made of coated tubes, complemented by a thermo-acoustic blanket.

Este site usa cookies para fornecer a funcionalidade necessária do site, melhorar sua experiência e analisar nosso tráfego. Ao usar nosso site, você concorda com nossa Política de Privacidade e uso de cookies.